background image

1.

After  completing  the

frame  set  up  step  3,  insert
the  60  degree  angled  end
of  the  gable  wire  into  the
cap  on  the  top  of  the  leg.
Insert  into  the  inside  hole.
Repeat on all corners.

4. 

Gently unfold the fabric  and place it over the open frame.

5.

Attach the fabric top to

the frame by matching the
quick  attachment  strips  on
the  fabric  with  the  quick
attachment  strips  on  the
frame.  Pull  the  corners
down  fully.  Push  the  strips

firmly together at each cor-
ner. Repeat on all corners.

6.

Continue frame set up.

2.

Connect  two  gable

wires  together  with  the
peak  hub.    On  the  peak
hub, make sure the E-Z UP
logo  is  facing  up  so  that
the  large  hole  is  exposed
on  top.    Insert  the  gable
wire  into  the  hole  at  the
bottom  of  the  peak  hub.
Repeat  on  opposite  gable
wire.

3. 

Insert  the  beam  wir e

into the holes on the top of
the  peak  hub  and  push
down gently .

Top Set-up Assembly Instruction 

for Glade 

4.

Continue frame set up.

1.

Complete the frame set up Step 1. Do not open complete-

ly in order to reduce the fabric tension during top set up.

2a.

( KIOSK TOP ) 

Insert the 3”

portion  of  the  straight  peak
tube  into  the  center  hole  on
the  top  of  the  slider.    The
long portion of the peak tube
should  be  facing  toward  the

outside corner

of the shelter.

Repeat on all corners.

2b.

( MARQUEE  TOP )

Insert

the  3”  portion  of  the  angled
peak  tube  into  the  center
hole on the top of the slider .
The long portion of the peak
tube should be facing towar d
the 

outside  cor ner

of  the

shelter. Repeat on all corners.

2c.

( HALF-PEAK  TOP ) 

Insert

the  3”  portion  of  the  angled
peak  tube  into  the  center
hole on the top of the slider.
The long portion of the kiosk
tube should be facing toward
the 

inside  corner

of  the 

shelter. Repeat on all cor ners.

3. 

Gently  unfold  the  fabric

top.    Place  the  fabric  in  the
center  of  the  shelter  and
work  out  fr om  the  inside.
Slide  the  interior  corner
pocket  onto  the  peak  tube
and  repeat  on  all  corners.
Secur e the top to the frame
by pushing the quick attach -
ment strips  together at each
cor ner. 

( kiosk top shown )

Top Set-up Assembly Instructions 

For Kiosk, Marquee and Half - Peak

1.

After  completing  the

frame  set  up  step  3,  insert
the  60  degree  angled  long
end  of  the  peak  wire  into
the  cap  on  the  top  of  the
leg.  Insert  into  the  inside
hole.  Repeat on all corners.

2.

Connect  the  four  ends

of  the  peak  wires  together
by  inserting  the  30  degree
angled  short  end  of  the
peak  wir e  into  the  r ound
peak hub.

4.

Attach the fabric top to

the frame by matching the
quick  attachment  strips  on
the  fabric  with  the  quick
attachment  strips  on  the
frame.  Pull  the  corners
down  fully.  Push  the  strips
firmly together at each cor-
ner. Repeat on all corners.

5.

Continue frame set up.

3. 

Gently unfold the fabric  and place it over the open frame.

Top Set-up  Assembly Instruction 

for Peak

Reviews: