Advanced Graphic Data Manager
Commissioning and use during operation
31
6
Commissioning and use during operation
6.1
Installation check
Make sure that all post-connection checks have been carried out before you put your unit into
operation:
• See Section 3.4 'Post-installation check'
• Checklist in Section 4.5 'Post-connection check'
6.2
Switching on the device
Once the operating voltage is applied, the display lights up and the unit is ready for operation.
• When you first commission the unit, program the setup in accordance with the description in the
Operating Instructions.
• If you are commissioning a unit that is already configured, measuring is immediately started in
accordance with the settings. The values of the display group currently configured appear on the
display.
6.2.1
Configuring the operating language
The default setting for the operating language is English. A different operating language can be
configured in the main menu.
Press the Navigator -> Language
Fig. 18:
Changing the operating language in the main menu