background image

Fastening the first board and last board

: Secure the first board along the house or at the outside 

of the deck. By face fastening with the appropriate screw for the deck material at each joist.

FOR USE WITH ANY ANGLED DECKING PATTERN

1. On the outside edge 

of your installed starter 

board, simply pinch the 

"wings" of EDGEXCLIP

 

together and slide the clip 

into the groove.

2. Place EDGEXCLIP

 

at every joist along the 

length of the board.

3. You are now ready to 

slide your next board up 

against EDGEXCLIPS 

 

between the two boards.

4. Holding the new board 

tightly in place, screw 

down all of clips between 

the board.

Use the yellow  

Never-Miss™ Guide

 

(

shown here) included, to  

perfectly engage the  

driver bit with the screw 

head for fastest  

installation.

5. Follow the same  

process for each deck 

board.

The "wings"of the clip will 

expand, holding the clip 

in place.  

NO NEED TO PRE-SET 

SCREW INTO JOIST.

Summary of Contents for EDGECLIP

Page 1: ...STALLATION GUIDE WARRANTY INFORMATION Note Before beginning installation please visit camofasteners com installation for best practices INSTALL DECKING IN HALF THE TIME FOR ANY ANGLED INSTALL REV 8 19 19 ...

Page 2: ...e clip in place 2 Place EDGECLIP at every joist along the length of the board 3 You are now ready to slide your next board up against the EDGECLIPS between the two boards 4 Holding the new board tightly in place screw down all of the clips between the boards Use the yellow Never Miss Guide shown here included to perfectly engage the driver bit with the screw head for fastest installation 5 Follow ...

Page 3: ...ide the clip into the groove 2 Place EDGEXCLIP at every joist along the length of the board 3 You are now ready to slide your next board up against EDGEXCLIPS between the two boards 4 Holding the new board tightly in place screw down all of clips between the board Use the yellow Never Miss Guide shown here included to perfectly engage the driver bit with the screw head for fastest installation 5 F...

Page 4: ...s in the board groove centered on joists on both sides of the boards and partially fasten the screws to hold the clips in place until next parallel board is in place and then fully tighten screws securing the clips You will need 4 clips for each butt joint Simply remove the snap off legs off EDGECLIP or the wings off EDGEXCLIP so that the clips can sit side by side on the double joists HOW MANY CL...

Page 5: ...ill come easily out of position 3 Clean away any clips remaining on the joists and lay the new deck board in position without any clips in place 4 Count the number of clips needed and snap off both legs or wings on each clip 5 Take the clip screws and gussets and from the board end slide down the groove and positioning a clip over each joist 6 Repeat for all joists and fasten clips securely in pla...

Page 6: ...and accepted building practices cause the deck board product to fail NNC will replace the damaged deck board product at no charge This does not replace any deck board manufacturers warranties does not apply in cases where defects or damage are not solely and exclusively attributable to the Product and is subject to the limitations described below This Limited Warranty does not apply where damage t...

Page 7: ...NATIONALNAIL COM CAMOFASTENERS COM NEWSLETTER OR CONTACT US AT INFO CAMOFASTENERS COM CAMODECKFASTENERS CAMOFASTENERS COM VIDEOS CAMOFASTENERS FOLLOW US ON SOCIAL MEDIA SIGN UP FOR OUR NEWSLETTER ...

Reviews: