Section 1. Site Preparation and Tower Assembly
1-9
Figure 1-7 Fitting the Tower Sections
1.8 Fitting AWS Components and Erecting the Tower
Section 2 of this manual details the fitting of sensors and other equipment, and the
final erection and guying of the tower.
Use one bolt per leg