Section 11. Programming Resource Library
112
11.3 Multiple Switch Closure Measurements
Pulse channel P_SW detects switch closures but P_LL does not. In order to
detect more than one switch closure device, a 100kOhm pull-up resistor must be
connected between and P_LL, C1, or C2. With the pull-up resistor in
place P_LL or the control port can detect a switch closure. In the following
example
p. 112, note that the PulseCount instruction for P_SW uses
configuration option 2 (Switch Closure), while P_LL must use option 0 (Pulse
Input).
CRBASIC EXAMPLE 18.
CRBASIC EXAMPLE. Two Rain Gages on a CR200(X)
'Rain(1) is wired to P_SW and Ground
'Rain(2) is wired to P_LL and Ground with a
'100,000 ohm resistor connecting P_LL to
Public Rain(2)
Units Rain()=mm
DataTable(Hourly,True,-1)
DataInterval(0,60,Min)
Totalize(2,Rain(),False)
EndTable
BeginProg
Scan(10,Sec)
PulseCount(Rain(1),P_SW,2,0,0.254,0)
PulseCount(Rain(2),P_LL,0,0,0.254,0)
CallTable(Hourly)
NextScan
EndProg
11.4 SDI-12 Sensor Support
11.4.1 SDI-12 Command Basics
Commands have three components:
Sensor address (a)
– a single character, and is the first character of the
command. Sensors are usually assigned a default address of zero by the
manufacturer. Wildcard address (?) is used in Address Query command.
Some manufacturers may allow it to be used in other commands.
Command body (e.g., M1)
– an upper case letter (the “command”) followed
by alphanumeric qualifiers.
Command termination (!)
– an exclamation mark.
An active sensor responds to each command. Responses have several standard
forms and terminate with <CR><LF> (carriage return – line feed).
Summary of Contents for CR200
Page 32: ...Section 2 Quickstart Tutorial 22 ...
Page 45: ...Section 3 Overview 35 3 3 Specifications ...
Page 46: ...Section 3 Overview 36 ...
Page 58: ...Section 4 Sensor Support 48 ...
Page 62: ...Section 5 Measurement and Control Peripherals 52 ...
Page 78: ...Section 8 CR200 X Configuration 68 ...
Page 102: ...Section 9 Programming 92 ...
Page 138: ...Section 11 Programming Resource Library 128 ...
Page 156: ...Section 16 Support Software 146 ...
Page 160: ...Section 17 Care and Maintenance 150 ...
Page 167: ...Section 18 Troubleshooting 157 18 3 3 2 Charging Circuit Test Solar Panel ...
Page 168: ...Section 18 Troubleshooting 158 18 3 3 3 Charging Circuit Test Transformer ...
Page 169: ...Section 18 Troubleshooting 159 18 3 3 4 Adjusting Charging Circuit Voltage ...
Page 170: ...Section 18 Troubleshooting 160 ...
Page 184: ...Appendix A Glossary 14 ...
Page 190: ...Appendix B Status Table and Settings 20 ...
Page 192: ...Appendix C Serial Port Pin Outs 22 ...
Page 211: ......