Section 8. Operation
344
simply connects between the IX terminal and the IXR terminal. The
capacitor has no polarity.
•
In difficult cases, settling error can be measured as described in
Measuring Settling Time
(p. 344).
Measuring Settling Time
Settling time for a particular sensor and cable can be measured with the CR3000.
Programming a series of measurements with increasing settling times will yield
data that indicate at what settling time a further increase results in negligible
change in the measured voltage. The programmed settling time at this point
indicates the settling time needed for the sensor / cable combination.
CRBasic example Measuring Settling Time
(p. 344)
presents CRBasic code to help
determine settling time for a pressure transducer using a high-capacitance
semiconductor. The code consists of a series of full-bridge measurements
(BrFull()) with increasing settling times. The pressure transducer is placed in
steady-state conditions so changes in measured voltage are attributable to settling
time rather than changes in pressure. Reviewing CRBasic Programming —
Details
(p. 129)
may help in understanding the CRBasic code in the example.
The first six measurements are shown in table First Six Values of Settling Time
Data
(p. 345).
Each trace in figure Settling Time for Pressure Transducer
(p. 345)
contains all twenty PT() mV/V values (left axis) for a given record number, along
with an average value showing the measurements as percent of final reading (right
axis). The reading has settled to 99.5% of the final value by the fourteenth
measurement, which is contained in variable PT(14). This is suitable accuracy
for the application, so a settling time of 1400 µs is determined to be adequate.
Measuring Settling Time
'This program example demonstrates the measurement of settling time using a single
'measurement instruction multiple times in succession. In this case, the program measures
'the temperature of the CR3000 wiring panel.
Public
RefTemp
'Declare variable to receive instruction
BeginProg
Scan
(1,Sec,3,0)
PanelTemp
(RefTemp, 250)
'Instruction to make measurement
NextScan
EndProg
measures the settling time of a sensor measured with a differential
'voltage measurement
Public
PT(20)
'Variable to hold the measurements
DataTable
(Settle,True,100)
Sample
(20,PT(),IEEE4)
EndTable
Summary of Contents for CR3000 Micrologger
Page 2: ......
Page 3: ......
Page 4: ......
Page 6: ......
Page 30: ......
Page 34: ......
Page 36: ......
Page 96: ......
Page 485: ...Section 8 Operation 485 8 11 2 Data Display FIGURE 110 Keyboard and Display Displaying Data ...
Page 487: ...Section 8 Operation 487 FIGURE 112 CR1000KD Real Time Custom ...
Page 491: ...Section 8 Operation 491 FIGURE 116 Keyboard and Display File Edit ...
Page 496: ......
Page 502: ......
Page 564: ...Section 11 Glossary 564 FIGURE 126 Relationships of Accuracy Precision and Resolution ...
Page 566: ......
Page 594: ......
Page 598: ......
Page 600: ......
Page 602: ......
Page 624: ......
Page 642: ......
Page 643: ......