Section 7. Installation
141
FIGURE 35: Connecting to Vehicle Power Supply
7.2.3 Uninterruptable Power Supply (UPS)
See
Power Input Terminals — Specifications
(p. 122)
for voltage and current limits.
A UPS (un-interruptible power supply) is often the best power source for
long-term installations. An external UPS consists of a primary-power source, the
charging regulator already integrated into the CR6, and an external battery. The
primary power source, which is often a transformer, power converter, or solar
panel, connects to the
CHG
terminals while a nominal 12 Vdc
sealed-rechargeable battery is connected to the
BAT
terminals.
Connect a rechargeable battery to the
BAT
terminals. The battery must be a
sealed rechargeable nominal 12 Vdc lead acid.
Connect a primary power source, such as a solar panel or Vac-to-Vdc transformer,
to
CHG
. The primary power source can be a 12 or 24 Vdc solar panel, or a Class
2, 24 Vdc power suppl. See
Primary Power Sources — List
(p. 668).
For sealed rechargeable lead acid batteries, the charge voltage requirement is 13.4
(slow) to 13.8 (fast) Vdc. The ideal charging voltage for batteries changes as
temperature changes, so provide an adequate buffer in the primary power source
in installations where significant temperature fluctuations are expected.
7.2.4 External Alkaline Power Supply
If external alkaline power is used, the alkaline battery pack is connected directly
to the
BAT
terminals. Voltage input range is 10 to 16 Vdc.
7.3
Grounding — Details
Grounding the CR6 with its peripheral devices and sensors is critical in all
applications. Proper grounding will ensure maximum ESD (electrostatic
discharge) protection and measurement accuracy.
Summary of Contents for CR6 Series
Page 2: ......
Page 4: ......
Page 6: ......
Page 32: ......
Page 36: ......
Page 38: ......
Page 76: ...Section 5 Overview 76 FIGURE 20 Half Bridge Wiring Example Wind Vane Potentiometer ...
Page 80: ...Section 5 Overview 80 FIGURE 23 Pulse Input Wiring Example Anemometer ...
Page 136: ......
Page 454: ...Section 8 Operation 454 FIGURE 104 Narrow Sweep High Noise ...
Page 459: ...Section 8 Operation 459 FIGURE 106 Vibrating Wire Sensor Calibration Report ...
Page 535: ...Section 8 Operation 535 8 11 2 Data Display FIGURE 121 CR1000KD Displaying Data ...
Page 537: ...Section 8 Operation 537 FIGURE 123 CR1000KD Real Time Custom ...
Page 538: ...Section 8 Operation 538 8 11 2 3 Final Storage Data FIGURE 124 CR1000KD Final Storage Data ...
Page 539: ...Section 8 Operation 539 8 11 3 Run Stop Program FIGURE 125 CR1000KD Run Stop Program ...
Page 541: ...Section 8 Operation 541 FIGURE 127 CR1000KD File Edit ...
Page 546: ......
Page 552: ......
Page 610: ...Section 11 Glossary 610 FIGURE 137 Relationships of Accuracy Precision and Resolution ...
Page 612: ......
Page 648: ......
Page 650: ......
Page 688: ......
Page 689: ......