Section 7. Installation
299
Scan
(100,mSec,100,0)
'Measure Bridge Resistance
BrFull
(Raw_mVperV,1,mV200,U1,U11,1,2500,True ,True ,0,15000,1.0,0)
'Calculate Strain for 1/4 Bridge (1 Active Element)
StrainCalc
(microStrain,1,Raw_mVperV,Zero_mVperV,1,GF_Adj,0)
'Steps (1) & (3): Zero Calibration
'Balance bridge and set Zero_Mode = 1 in numeric monitor. Repeat after
'shunt calibration.
FieldCalStrain
(10,Raw_mVperV,1,0,Zero_mVperV,Zero_Mode,0,1,10,0 ,microStrain)
'Step (2) Shunt Calibration
'After zero calibration, and with bridge balanced (zeroed), set
'KnownRes = to gage resistance (resistance of gage at rest), then set
'Shunt_Mode = 1. When Shunt_Mode increments to 3, position shunt resistor
'and set KnownRes = shunt resistance, then set Shunt_Mode = 4.
FieldCalStrain
(13,MicroStrain,1,GF_Adj,0,Shunt_Mode,KnownRes,1,10,GF_Raw,0)
CallTable
CalHist
NextScan
EndProg
7.7.12.6.3 FieldCalStrain() Quarter-Bridge Shunt Example
With CRBasic example
FieldCalStrain() Calibration
(p. 298)
sent to the CR6, and
the strain gage stable, use the CR1000KD Keyboard/Display or software numeric
monitor to change the value in variable
KnownRes
to the nominal resistance of
the gage,
1000
Ω, as shown in figure
Strain Gage Shunt Calibration Start
(p. 299).
Set
Shunt_Mode
to
1
to start the two-point shunt calibration. When
Shunt_Mode
increments to
3
, the first step is complete.
To complete the calibration, shunt R1 with the 249 kΩ resistor. Set variable
KnownRes
to
249000
. As shown in figure
Strain Gage Shunt Calibration Finish
(p. 300),
set
Shunt_Mode
to
4
. When
Shunt_Mode
=
6
, shunt calibration is
complete.
FIGURE 66: Strain Gage Shunt
Calibration Start
Summary of Contents for CR6 Series
Page 2: ......
Page 4: ......
Page 6: ......
Page 32: ......
Page 36: ......
Page 38: ......
Page 76: ...Section 5 Overview 76 FIGURE 20 Half Bridge Wiring Example Wind Vane Potentiometer ...
Page 80: ...Section 5 Overview 80 FIGURE 23 Pulse Input Wiring Example Anemometer ...
Page 136: ......
Page 454: ...Section 8 Operation 454 FIGURE 104 Narrow Sweep High Noise ...
Page 459: ...Section 8 Operation 459 FIGURE 106 Vibrating Wire Sensor Calibration Report ...
Page 535: ...Section 8 Operation 535 8 11 2 Data Display FIGURE 121 CR1000KD Displaying Data ...
Page 537: ...Section 8 Operation 537 FIGURE 123 CR1000KD Real Time Custom ...
Page 538: ...Section 8 Operation 538 8 11 2 3 Final Storage Data FIGURE 124 CR1000KD Final Storage Data ...
Page 539: ...Section 8 Operation 539 8 11 3 Run Stop Program FIGURE 125 CR1000KD Run Stop Program ...
Page 541: ...Section 8 Operation 541 FIGURE 127 CR1000KD File Edit ...
Page 546: ......
Page 552: ......
Page 610: ...Section 11 Glossary 610 FIGURE 137 Relationships of Accuracy Precision and Resolution ...
Page 612: ......
Page 648: ......
Page 650: ......
Page 688: ......
Page 689: ......