Section 7. Installation
333
CRBasic Programs and Notes
PT100 BrHalf4W() Four-Wire Half-Bridge Calibration
'This program example demonstrates the calibration of a 100-ohm PRT (PT100) in a four-wire
'half bridge with voltage excitation. See adjacent procedure and schematic.
'Declare constants and variables:
Const
Rf = 100000
'Value of bridge resistor
Public
X
'Raw output from the bridge
Public
RS0
'Calculated PT100 resistance at 0 °C
BeginProg
Scan
(1,Sec,0,0)
....'Measure X:
'BrHalf4W(Dest,Reps,Range1,Range2,DiffChan,ExChan,MeasPEx,ExmV,RevEx,RevDiff,
' SettlingTime,
fN1
(p. 584),
Mult,Offset)
BrHalf4W
(X,1,mV200,mV200,U3,U1,1,2500,True,True,0,15000,1,0)
'Calculate RS0:
RS0 = X * Rf
NextScan
EndProg
PT100 BrHalf4W() Four-Wire Half-Bridge Measurement
'This program example demonstrates the measurement of a 100-ohm PRT in a four-wire
'half bridge using current excitation. See previous procedure and schematic.
'Declare constants and variables:
Const
Rf = 100000
'Value of bridge resistor
Const
RS0 = 100000
'Resistance of PT100 at 0 °C from calibration program
Public
X
'Raw output from the bridge
Public
RS
'Calculated PT100 resistance
Public
RS_RS0
'Calculated ratio of RS/RS0
Public
DegC
'Calculated temperature
BeginProg
Scan
(1,Sec,0,0)
....'Measure X:
'BrHalf4W(Dest,Reps,Range1,Range2,DiffChan,ExChan,MeasPEx,ExmV,RevEx,RevDiff,
' SettlingTime,
fN1
(p. 584),
Mult,Offset)
BrHalf4W
(X,1,mV200,mV200,1,U11,1,2500,True,True,0,15000,1,0)
'Calculate RS and RS/RS0:
RS = X * Rf
RS_RS0 = RS/RS0
....'Calculate temperature from RS_RS0:
'PRTCalc(Dest,Reps,Source,PRTType,Mult,Offset)
PRTCalc
(DegC,1,RS_RS0,1,1.0,0)
NextScan
EndProg
Summary of Contents for CR6 Series
Page 2: ......
Page 4: ......
Page 6: ......
Page 32: ......
Page 36: ......
Page 38: ......
Page 76: ...Section 5 Overview 76 FIGURE 20 Half Bridge Wiring Example Wind Vane Potentiometer ...
Page 80: ...Section 5 Overview 80 FIGURE 23 Pulse Input Wiring Example Anemometer ...
Page 136: ......
Page 454: ...Section 8 Operation 454 FIGURE 104 Narrow Sweep High Noise ...
Page 459: ...Section 8 Operation 459 FIGURE 106 Vibrating Wire Sensor Calibration Report ...
Page 535: ...Section 8 Operation 535 8 11 2 Data Display FIGURE 121 CR1000KD Displaying Data ...
Page 537: ...Section 8 Operation 537 FIGURE 123 CR1000KD Real Time Custom ...
Page 538: ...Section 8 Operation 538 8 11 2 3 Final Storage Data FIGURE 124 CR1000KD Final Storage Data ...
Page 539: ...Section 8 Operation 539 8 11 3 Run Stop Program FIGURE 125 CR1000KD Run Stop Program ...
Page 541: ...Section 8 Operation 541 FIGURE 127 CR1000KD File Edit ...
Page 546: ......
Page 552: ......
Page 610: ...Section 11 Glossary 610 FIGURE 137 Relationships of Accuracy Precision and Resolution ...
Page 612: ......
Page 648: ......
Page 650: ......
Page 688: ......
Page 689: ......