Section 8. Operation
350
Parameters that Control Measurement Sequence and
Timing
CRBasic Instruction Parameter
Action
MeasOfs
Correct ground offset on single-ended
measurements.
SettlingTime
Sensor input settling time.
Integ
Duration of input signal integration.
RevDiff
Reverse high and low differential
inputs.
RevEx
Reverse polarity of excitation voltage.
Measurement Integration
Integrating the signal removes noise that creates error in the measurement. Slow
integration removes more noise than fast integration. Integration time can be
modified to reject 50 Hz and 60 Hz mains-power line noise.
Fast integration may be preferred at times to,
•
minimize time skew between successive measurements.
•
maximize throughput rate.
•
maximize life of the CR800 power supply.
•
minimize polarization of polar sensors such as those for measuring
conductivity, soil moisture, or leaf wetness. Polarization may cause
measurement errors or sensor degradation.
improve accuracy of an LVDT measurement. The induced voltage in an LVDT
decays with time as current in the primary coil shifts from the inductor to the
series resistance; a long integration time may result in most of signal decaying
before the measurement is complete.
Single-Ended Measurements — Details
Related Topics:
•
Single-Ended Measurements — Overview
(p. 67)
•
Single-Ended Measurements — Details
(p. 350)
With reference to the figure
Programmable Gain Input Amplifier (PGIA)
(p. 349),
during a single-ended measurement, the high signal (H) is routed to V+. The low
signal (L) is automatically connected internally to signal ground with the low
signal tied to ground ( ) at the wiring panel. V+ corresponds to odd or even
numbered
SE
terminals on the CR800 wiring panel. The single-ended
configuration is used with the following CRBasic instructions:
Summary of Contents for CR800 Series
Page 2: ......
Page 4: ......
Page 6: ......
Page 32: ......
Page 34: ......
Page 54: ......
Page 92: ......
Page 310: ......
Page 446: ...Section 8 Operation 446 8 11 2 Data Display FIGURE 100 CR1000KD Displaying Data ...
Page 448: ...Section 8 Operation 448 FIGURE 102 CR1000KD Real Time Custom ...
Page 449: ...Section 8 Operation 449 8 11 2 3 Final Storage Data FIGURE 103 CR1000KD Final Storage Data ...
Page 450: ...Section 8 Operation 450 8 11 3 Run Stop Program FIGURE 104 CR1000KD Run Stop Program ...
Page 452: ...Section 8 Operation 452 FIGURE 106 CR1000KD File Edit ...
Page 456: ......
Page 462: ......
Page 523: ...Section 11 Glossary 523 FIGURE 116 Relationships of Accuracy Precision and Resolution ...
Page 524: ......
Page 526: ......
Page 556: ......
Page 558: ......
Page 560: ......
Page 597: ......