CS300 Pyranometer
8
5. Turn the levelling screws as required to bring the bubble of the bubble level
within the ring.
6. Tighten the mounting screws to secure the assembly in its final position.
Check that the pyranometer is still correctly levelled and adjust as necessary.
7. Route the sensor cable along the underside of the crossarm to the
tripod/tower, and to the instrument enclosure.
8. Secure the cable to the crossarm and mast using cable ties.
9. Remove the green cap after installing the sensor. Save this cap for shipping
or storing the sensor.
7.3
Wiring to the Datalogger
A schematic diagram of the CS300 is shown in Figure 7-1.
RED
BLACK
CLEAR
500 to 600
typical
Single-Ended
Analog Input
Ground/AG
Ground/G
Figure 7-1. CS300 schematic
Connections to Campbell Scientific dataloggers are given in Table 7-1. When
Short Cut
is used to create the datalogger program, the sensor should be wired to
the channels shown in the wiring diagram created by
Short Cut
.
Cable Tie