2-1
SECTION 2. ET TOWER INSTALLATION
DANGER: Do not install near power lines. If any part of the tower comes in contact with power
lines you could be KILLED. Contact local utilities for the location of buried utility lines before digging
or driving grounding rods.
CAUTION: Do not fit the 3 meter ET Tower sections together until the appropriate time. Once
attached, they cannot be detached.
The ET Tower provides a support structure for mounting the ET101 and ET106 weather station
components. Figure 2.1-1 shows a typical ET Tower installation option. The tower is designed to
withstand winds of 100 mph. The lightning rod assembly is attached after the instrumentation enclosure
is installed (Section 3.1).
Transformer
User Supplied
Junction Box
110 VAC
16 VAC
Power
Valve Box
Communications
Line
Direct Bury
Splices
Concrete
Base
Ground
Rod
ET Tower
FIGURE 2.1-1. ET Tower Installation
Summary of Contents for ET101
Page 4: ...This is a blank page ...
Page 12: ......
Page 26: ......
Page 30: ......
Page 32: ......
Page 36: ......
Page 37: ...This is a blank page ...