SECTION 3. INSTRUMENTATION INSTALLATION
3-4
FIGURE 3.1-6. MSX10 Solar Panel
on CM6 or CM10 Tripod
FIGURE 3.1-7. MSX10 Solar Panel
on UT10 or UT30 Tower
3.2 SENSOR CONNECTION
External MetData1 sensors connect to one of
seven bulkhead connectors on the bottom of
the MetData1 enclosure, as shown in Figure
3.2-1. Telephone and short haul modem wires
connect to connector #8. All power connections
occur at the AC/solar connector. Coaxial
bulkhead connectors are installed in the “pop-
out”. The ground chuck should be connected to
earth ground.
The CS105MD mounts in the enclosure as
shown in Figure 3.12-2. Connect to internal
wiring panel of MetData1 as shown below:
Green ---------- 6H
White ---------- 6L
Black ---------- GND
Red ---------- 12V Switch
MSX10
Mounting
Bracket
U-bolt
MSX10
Mounting
Bracket
U-bolt