Appendix B. PS24 24 Ahr Power Supply and 10 x 12 inch Enclosure
13. Follow the Installation of Battery procedure provided in FIGURE B-10.
Plug the battery into the connector on the CH100 marked “INT”.
FIGURE B-10. Procedure for installing and connecting battery
14. An extra loop of ground wire was sent with the station. Use it to ground
the enclosure to the grounding rod system. The external ground lug is
mounted on the bottom left hand corner of the 10 x 12 enclosure.
15. Flip the switch to “ON”, and test drive the station.
16. After everything checks out, find the gray duct putty that was included in
the enclosure supply kit. Seal the cable-entry conduit by placing putty on
the inside and outside of it. Push the putty down into the cable entries.
B-11
Summary of Contents for T107
Page 2: ......
Page 3: ......
Page 49: ...T107 Weather Station FIGURE 2 31 Slide Antenna Bracket U Bolt around Back of the Pole 41...
Page 78: ...T107 Weather Station 70...
Page 93: ...Appendix C Exploded Views C 1 Enclosure C 1...
Page 94: ...Appendix C Exploded Views C 2 Crossarm C 2...
Page 102: ...Appendix D Default Programs D 8...
Page 105: ......