7. Check contents against invoice and shipping checklist (
5)) and contact your Toro representative immediately about any shortages.
8. Securely tape box shut if transporting entire station to another site.
9. If at the main site, remove communication components that are installed at the calling
computer. Repackage remaining components for transport to field site.
FIGURE 3-3. T107 with the Met One 034B-ETM Wind Sensor, top layer
Section 3. Initial inspection
4