threads should be about 1 cm (0.5 in) above the concrete (
(p. 14)). The
template must be level in two dimensions.
FIGURE 6-2. Cut-away view shows anchor bolt and conduit placement in cement pad
12. Use a trowel and edger to finish.
13. Wait 24 hours before removing the concrete form.
14. Wait seven days before mounting the pole.
6.2 AC power installation procedure
The AC power option includes a 100 to 240 VAC to 24 VDC power supply.
1. Mount the power supply inside a user-supplied junction box according to local electrical
codes.
CAUTION:
Avoid dangerous electrical accidents when using the AC power option by locating the
Section 6. Installation
14