1. Pull the gold funnel up and off of the top of the rain gage.
2. Remove the rubber band holding the tipping mechanism in place (
(p. 31)).
FIGURE 6-18. Remove rubber band from tipping mechanism
3. Adjust the bolts at the bottom of the pole as needed to get the bubble level centered.
4. Put the gold funnel back on the top of the rain gage after leveling has been completed.
5. Plug the cable in the RAIN/PRECIP connector on the enclosure. Ensure that the plug is
completely seated on the connector and the locking ring is turned a quarter revolution
clockwise.
6.6.5 Pyranometer
1. Adjust the three leveling screws until the bubble level indicates plumb (
32)).
Section 6. Installation
31