FIGURE 7-8. Template frame placement
7. Remove the screws that secure the template frame to the concrete form. Remove the top
nylon nut from each anchor bolt, then lift the template and template frame off the anchor
bolts. Remove the remaining nylon nuts from the anchor bolts.
8. Apply the anti-seize lubricant included with the anchor bolts to the threads on each anchor
bolt. Thread a clevis onto each anchor bolt until three threads of each anchor bolt are
visible inside each clevis. Angle the clevises in the same direction to allow the tower to tilt
away from the equator as shown in
(p. 18). Leg 1 will be one of the two legs
along the side aimed at the equator. This positioning allows a solar panel to be attached to
two tower legs while providing easy access to sensors at the top of the tower.
UT20 and UT30 Universal Towers
17
Summary of Contents for UT20
Page 1: ...Revision 03 2020 Copyright 1993 2020 Campbell Scientific Inc...
Page 10: ...FIGURE 5 1 UT20 tower UT20 and UT30 Universal Towers 7...
Page 38: ...FIGURE 7 28 Bracket selection UT20 and UT30 Universal Towers 35...
Page 41: ...A B 14 7 Page 1 of 3 A A B B C C 1 2 3 0 1 2 3 3 inch reference...
Page 42: ...C 43 2 cm 17 in A UTBASE Page 2 of 3 A A B B C C 1 2 3 0 1 2 3 3 inch reference...
Page 43: ...C B UTBASE Page 3 of 3 A A B B C C 1 2 3 0 1 2 3 3 inch reference...