FIGURE 7-6. Template placement
5. Adjust the placement of the template on the anchor bolts to ensure there is 4.4 cm (1.75 in)
clearance for the end of the anchor bolt once the concrete has been poured (
(p. 16)). Adjust the bolt position in the template until the correct clearance is set. Wrap the
visible threads at the top of each anchor bolt with masking tape to keep the threads clean
as the concrete is poured.