52
Wiring the Lead Lag Setup
Use Cascade terminals in the juntion box to wire lead lag appliances
Master
Slave 2
..
Slave 7
J3, MB2
A
A
..
A
B
B
..
B
C
C
..
C
Figure 34: Lead Lag Wiring Setup (Left: Master, Right: Slave)
NOTE
Recycle power on all boilers after programming is complete if lag boilers are not discovered automatically
NOTE
CH Setpoint or DHW Setpoint must match Setpoint located in Lead Lag Master Configuration in order for the system to operate
correctly.
NOTE
The Local/Remote switch (explained below) must be set in the “Local” position on ALL lag boilers.
112.4
LOCAL/REMOTE SWITCH
The local remote switch mounted inside the control box is designed to deliver an enable signal either relying on an external contact
closure (
Remote
) or enabling the boiler locally (
local
). When
Remote
is selected via the DPDT switch, the Remote Operator contacts
must close to deliver an enable signal. When
Local
is selected via the DPDT switch, a constant enable signal is present. When
troubleshooting the
Advantus
, it is recommended to switch to
Local
mode.
6.5
MODBUS, BACNET IP, BACNET MSTP, LONWORKS, METASYSN2 INTEGRATION
For more instructions on interfacing with Modbus/Bacnet/LonWorks/MetasysN2 Network:
Summary of Contents for ADVANTUS AVH 500
Page 2: ......
Page 3: ......
Page 38: ...31 Figure 23 Recommended Piping with Reverse Return and Variable Primary Flow...
Page 88: ...81 PART 12 EXPLODED VIEW Figure A...
Page 89: ...82 Figure B FAN BURNER ASSEMBLY AV500 600 some items may not be as shown...
Page 90: ...83 Figure C FAN BURNER ASSEMBLY AV800 4000 some items may not be as shown...
Page 91: ...84 Figure D Figure E...
Page 92: ...85 Figure F Figure G...
Page 93: ...86 Figure H CONTROL BOARD ASSEMBLY...
Page 100: ...93 PART 13 ELECTRICAL DIAGRAMS...
Page 101: ...94...
Page 102: ...95...