background image

 

INTRODUCTION 

 

Camus Hydronics proudly introduces its Blue-Flame Series of Water Heaters / Hydronic Boilers. 
These machines are thoughtfully designed for easy operation and maintenance. We are confident 
that you will come to appreciate the benefits of our product.

 

1.      GENERAL INSTRUCTIONS 

 

The installation of this heater must conform to the requirements of the authority having 
jurisdiction or, in the absence of such requirements, to the National Fuel Gas Code, ANSI 
Z223.1 or CAN/CGA B149 Installation Codes. All electrical wiring must be done in accordance 
with the requirements of the authority having jurisdiction or, in the absence of such 
requirements, with the National Electrical Code, ANSI/NFPA 70 or the Canadian Electrical Code 
Part I, CSA C22.1 Electrical Code. 
 
Vent installations must be in accordance with Part 7, Venting of Equipment, of the National Fuel 
Gas Code, ANSI Z223.1, or Section 7, Venting Systems and Air Supply for Appliances, of the 
CAN/CGA B149.1, Installation Codes and applicable provisions of the local building codes. 
 
When required by the authority having jurisdiction, the installation must conform to the Standard 
for Controls and Safety Devices for Automatically Fired Boilers, ANSI/ASME CSD-1. 
 
The qualified installer shall instruct the end user in the safe and correct operation of this 
appliance and shall ensure that the heater is in safe working order prior to leaving the job site. 
 

WARRANTY: 
 
Factory warranty shall apply only when the boiler is installed in accordance with:  
 

 

Local codes, standards, ordinances and regulations,  

 

The printed instructions provided with the boiler and;  

 

Good industry practices. 

 
Excessive water hardness causing a lime build-up in the copper coils or tubes is not a 
fault of the boiler and is not covered by warranty. Consult the factory for 
recommendations for use in hard water areas. 
 
Using or storing corrosive chemicals in the vicinity of this boiler can rapidly attack the 
copper tubes and coils and voids warranty. 
 
This boiler is intended to operate under non-condensing conditions. Inlet temperatures 
must be maintained at 110

°

F or higher. Warranty is void if heater is allowed to operate in 

condensing mode. 
  
Damage caused by freezing or dry firing voids warranty. 
 
This boiler is not to be used for temporary heating of buildings under construction. 

Summary of Contents for BLUE-FLAME Series

Page 1: ...nce WHAT TO DO IF YOU SMELL GAS o Do not try to light any appliance o Do not touch any electrical switch do not use any phone in your building o Immediately call your gas supplier from a neighbour s p...

Page 2: ...9 WARNING REGARDING CHILLED WATER SYSTEMS 8 10 PIPING OF BOILER TO THE SYSTEM FIG 3 8 11 PLACING BOILER IN OPERATION 10 12 CHECK OUT OF IGNITION SYSTEM SAFETY SHUT OFF DEVICE 10 13 LOW WATER TEMPERAT...

Page 3: ...by the authority having jurisdiction the installation must conform to the Standard for Controls and Safety Devices for Automatically Fired Boilers ANSI ASME CSD 1 The qualified installer shall instru...

Page 4: ...to combustibles as follows TOP 12 SIDES 12 REAR 12 VENT 6 3 PROVIDE AIR FOR COMBUSTION AND VENTILATION Provisions for combustion and ventilation air must be in accordance with section 5 3 Air for comb...

Page 5: ...ff and remote controller use terminal strip provided inside control panel Refer to wiring diagram provided with boiler 5 GAS SUPPLY AND PIPING This boiler is intended to operate at inlet gas pressures...

Page 6: ...installations always consider the use of a shelter such as a garden shed in lieu of direct exposure of the appliance to the elements The additional protection afforded by the shelter will help to min...

Page 7: ...ove return doors windows exhaust fans fireplace dampers and any other gas burning appliance to their previous condition of use g Any improper operation of the common venting system must be corrected s...

Page 8: ...6 Three venting options are available for this boiler See Figure 1 below for details Standard Venting Outdoor Venting Sidewall Venting Side View Figure 1...

Page 9: ...relief valve sized in accordance with ASME Boiler and Pressure Vessel Code Section IV Heating Boilers The relief valve is to be installed in the vertical position and mounted in the hot water outlet N...

Page 10: ...means to prevent gravity circulation of chilled water through the boiler Chilled water in the boiler will create condensate on the boiler tubes which will collect in the combustion chamber causing co...

Page 11: ...tion level it must be provided with a low water cutoff device at the time of boiler installation Available from factory To eliminate trapped air install venting devices at high points in the system as...

Page 12: ...ter level in expansion tank If level exceeds of tank volume air is still trapped in system Shut down boiler and continue to run pumps Within 3 days of start up recheck all air vents and expansion tank...

Page 13: ...e after 15 minutes c If the inlet temperature is less than 110 F slowly close outlet valve until the inlet temperature climbs to 110 F d If the inlet temperature is greater than 110 F but not greater...

Page 14: ...ns Figure 5 15 PILOT AND MAIN BURNER FLAMES To maintain safe operation and the greatest efficiency of the boiler check the main burner and pilot burner every six months for proper flame characteristic...

Page 15: ...off power and close main manual gas valve Allow burners to cool before removal 2 Loosen union and remove main burner tray assembly from boiler 3 Remove and thoroughly clean burners Check all ports and...

Page 16: ...e ignition electrode using sandpaper Once the pilot appears to be properly set reinstall it into the boiler making sure to properly tighten the pilot line connection Once the spark is satisfactory ope...

Page 17: ...tion 15 of this manual After the first season of operation inspect the heat exchanger and venting Follow the detailed instructions in section 6 of this manual CAUTION Label all wires prior to disconne...

Page 18: ...ime to light the pilot if air is not present in the pilot line If pilot fails to light and you suspect air in the line close the main manual valve and repeat lighting steps 1 thru 5 7 Once the pilot l...

Page 19: ...lame Adjust if necessary Remove pilot and ensure that spark electrode is clean and properly located 5 Pilot lights but main burner does not fire Ensure that main firing valve is in OPEN position Check...

Page 20: ...CAL DIAGRAMS Each Blue Flame boiler will be provided with its own wiring diagram to guarantee that any options ordered with the unit are properly detailed The following diagrams 99 5020 and 99 5021 ar...

Page 21: ...19...

Page 22: ...20...

Page 23: ...21 21 EXPLODED VIEW...

Page 24: ...22 22 BLUE FLAME REPLACEMENT PARTS LIST...

Page 25: ...standard warranty 2 Years six through ten replacement purchase price pro rated at the following schedule Year six 60 Year seven 65 Year eight 70 Year nine 75 Year ten 80 of the current list price of...

Page 26: ...uilt water heaters and heating boilers as well as a into every single unit For more information supplier of specialty HVAC products Our service line is open 24 hours 7 days a week on our innovative pr...

Reviews: