T O R O N T O S E
Installation: Electrical power requirements
2 Single Phase (live 1, neutral 1, live 2, neutral 2, ground)]
230VAC, 50/60Hz, 2þ, 16A, (Circuit Breaker rating = 20A max each
phase line.)
In 2x16A Service:
Pump 2 (if any) and the Heater are on one service. Everything else is
on the other service.
For 2-Wire connection:
1.Completely remove jumper on J51 and J88.
2.Completely remove jumper on J52 and J62.
3. Make a connection between jumper J60 andJ36
4. Make a connection between jumper J41 and J12
5. Make a connection between jumper J46 and J75
6. Make a connection between jumper J20 and J77
7. Make a connection between jumper J38 and J54
8. Put DIP switches A2, A3 and A5 on ON
B.) 2 Single Phase connection:
3-Phase 5 wires (live 1, live 2, live 3, neutral, ground)]
400VAC, 50/60Hz*, 3þ, 16A, (Circuit Breaker rating = 20A max each
phase line.)
In 3x16A Service:
Pump 2 is on one service.
The Heater is on another service.
Everything else is on the remaining service.
For 3-phase connection:
1.Completely remove jumper on J51 and J88.
2.Completely remove jumper on J52 and J62.
3. Make a connection between jumper J60 andJ45
4. Make a connection between jumper J41 and J79
5. Put DIP switches A2 and A3 on ON and DIP switch A5 on OFF.
C.) 3 - Phase connection (Where available and needed):
Power connections - Continued
IMPORTANT - Service must include a neutral wire, with a line to neutral voltage of 230VAC. *BP systems automatically detect 50Hz vs 60Hz.
NOTE:
Excludes ‘Plug & Play’ Spa models.
International cable colour system
For the purpose of standardizing technical requirements, the CENELEC countries (including Austria, Belgium, Czech Republic, Denmark,
Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Luxembourg, Malta, Netherlands, Norway, Portugal, Slovakia, Spain, Sweden,
Switzerland and United Kingdom) have adopted the following colour code:
Systems
1-phase system
3-phase system
Phase (or line)
Brown
Neutral
Blue
Blue
L1
Brown
L2
Black
L3
Grey
Earth
Green
/ Yellow
Green
/ Yellow
(11)