Please return completed form to inverter.register@canadiansolar.com
www.canadiansolar.com
page 4 of 5
PROJECT NAME
LOCATION
NUMBER
INSTALLATION AND
COMMISSIONING CHECKLIST
Warning: This checklist is not a replacement for the user manual.
Please read the user manual prior to inverter site selection and installation.
3 PHASE STRING INVERTERS
(KTL SERIES)
C
S
IF
-S
T-
0
1
6 A
/0
System Owner:
Address / Location:
Note site typical arrangements and variances
Inverter model:
Inverter irmware revision: DSP:
LCD:
Number of inverters:
Inverter mounting tilt:
Output power*:
Input DC voltage:
Insulation limit (K):
PV start-up voltage:
Grid: V Max: V Min:
Frequency Max: Min:
Reactive compensation:
+/- PF
Coniguration: MPPT Individual
MPPT Parallel
Monitoring: RS485:
Ethernet:
Monitoring equipment and supplier:
PV module manufacturer:
PV model:
DC cable size:
AC cable size:
Transformer ratings, supplier:
Number of series connected modules in PV strings:
Number of PV strings in parallel per MPPT:
Total System size (DC Watts):
*Specify de-rated power and add nameplate power in parenthesis
GENER AL COMMENTS / OBSERVATIONS: