Canarm Tri-Lite 3LEC Series
15
6
mOUNTING Method 2: Angle Irons
6.5 Attach Upper Yoke (to Angle Iron):
Secure the upper yoke directly to the angle irons with the Beam Clamp hardware as depicted below. Consult the
diagrams below for distances between the angle irons. Do not install the fan from a single purlin, truss, or bar
joist.
Tighten bolts to 90 ft-lb (122 N-m) using a 3/4” socket and torque wrench.
Beam Clamp Hardware (supplied):
a.
(4) 1/2”-13x2-1/2” GR 5 Bolt
b.
(8) 1/2” Flat Washer
c.
(4) 1/2”-13 Nylock Nut
The angle irons should be aligned with the innermost holes of the upper yoke.
Les fers angulaires doivent être alignés avec les trous les plus à l’intérieur de la culasse supérieure.
After attaching upper yoke to the angle irons, tighten all the bolts securing the angle irons to the roof structure to
90 ft-lb (122 N-m) using a 3/4” socket with torque wrench.
Après l’avoir fixée culasse supérieure aux cornières, serrer tous les boulons de fixation des cornières à la structure
du toit à 90 lb-pi (122 Nm) avec une “prise 3/4 avec une clé dynamométrique.
CAUTION/ATTENTION
!
a
b
b
c
Upper Yoke Side View
11 1/4” (28.32cm)
Upper Yoke Top View
13 3/4” (34.9cm) x 8” (20.32cm)
5 1/2”
(13.97cm)