background image

4000 AVE. PINARD, 

ST-HYACINTHE, 

QUÉBEC, CANADA, 

J2S 8K4, 

TEL: 450-383-4000, 

FAX: 450-383-4004 

www.ventecventilation.com

 

Sept. 8, 2016 

       PAGE 6 OF 17 

REV 4 

2

 

OVERVIEW OF THE PROJECT MECHANICAL INSTALLATION 

2.1

 

PREPARING TO INSTALL THE FAN 

Review

 

this

 

entire

 

manual

 

wi

th the 

installati

on 

t

eam and 

shar

inform

ation 

with

 

necessary

 

personnel.

 

 

Physically confirm the arrangements and locations of the system cyclones and controls. Verify your order 
documents for the system configuration. 

 

There are several components that can be assembled on the floor for easier cyclone system installations. 

Consult

 

your

 

constructi

on 

professionals.

 

 

Consult with your professional construction team and review this installation. 

 

Review and prepare your electrical and structural building components. 

Pl

an 

to

 

receiv

e and 

stor

e the 

sy

stem 

components.

 

 

Check inside the freight and inspect it while the driver is present. Report any damages to the driver and your 
sales representative. 

 

Store the freight in a location that has proper access for material handling and that will keep it in good 
condition; avoid storing the material in corridors where tractors or other vehicles can cause damage. 

Al

th

floor

 

work

 

should

 

b

e done 

in

 a 

dedica

ted 

workspac

to

 

begi

th

installation.

 

T

he 

fans

 

hav

heavy

 

ey

loops

 

for

 

handling

 and 

hanging.

 

T

he 

Cycl

one 

Plus

 

is

 

heavy

 and 

awkwar

d to 

handle.

 

Please

 use 

cautio

n and 

maximu

safety

 

wh

en 

handling.

 

 

The optional variable frequency drive (VFD) shall be resilient mounted and installed within a distance of 

20

 

feet

 

from the fan. 

 

The VFD shall be positioned upright to allow airflow out both sides of the heat sink. 

 

The VFD motor wiring and terminations has to be done by licensed electricians. 

 

In high moisture applications a waterproof connector and drip loop in the wire should be used. 

 

Check sheaves and belts for alignment and tension in case they have moved during the shipping. They should 
be adjusted if required. 

 

The bearings should be inspected and greased as required. We recommend yearly greasing and maintenance. 
Grease nipple is located on the back of the impeller shaft. 

 

Inspect for defects or missing parts. Discrepancies shall be reported to the sales department. 

PUTTING INNOVATION TO WORK

7686 16 Line, Arthur, ON. 

N0G 1A0 

Email: agsales@canarm.ca 

Tel: 1-800-263-5314 

Fax: 519-848-3948 

www.canarm.com

Summary of Contents for AgSystem CYCLONE PLUS

Page 1: ...4 TEL 450 383 4000 FAX 450 383 4004 WWW VENTEC CA CYCLONE PLUS INSTALLATION MANUAL PUTTING INNOVATION TO WORK CYCLONE PLUS INSTALLATION MANUAL 7686 16 Line Arthur ON N0G 1A0 www canarm com Email agsal...

Page 2: ......

Page 3: ...CYCLONE IN PLACE 8 3 2 2 STEP 2 INSTALL CYCLONE DEFLECTORS 8 4 DIRECTIONS FOR HANGING MOUNTING THE CYCLONE 9 4 1 CEILING SUSPENDED 9 4 2 WALL OR COLUMN INSTALLATION 10 4 3 FLOOR STANDING MOUNT 11 5 AS...

Page 4: ...and efficient recirculation fans available on the market today Its main benefits are It moves a large volume of air 86 000cfm It creates vertical wind for cooling at floor level It can run at low spee...

Page 5: ...s as described in figure 2 The installation is by design made simple for skilled tradesmen If you are unsure about this please call our number for technical support 1 800 260 5314 We recommend you hir...

Page 6: ...age weight is 450 lbs Weight 375 lbs without packaging and skid Skid sizes are roughly 3 8 W H 2 The deflectors mounting hardware and deflector mounting brackets are shipped with the fan and require a...

Page 7: ...igh speed 60Hz for 245rpm Visit Canarm com to view our full offering of controls 460VAC drives are also available on demand and require the addition of line reactors You can also add one of our temper...

Page 8: ...ood condition avoid storing the material in corridors where tractors or other vehicles can cause damage All the floor work should be done in a dedicated workspace to begin the installation The fans ha...

Page 9: ...ion airflow See Fig 5 Figure 4 4 Cyclone Plus assembled for two o directions airflow Figure 5 Cyclone Plus assembled for one e direction airflow Sept 8 2016 PAGE 7 OF 17 REV 4 PUTTING INNOVATION TO WO...

Page 10: ...he intake together ng M6x30mm Mech Screw at you have a space of inc x9 M6 ch between the Sept 8 2016 PAGE 8 OF 17 REV 4 Install the top of the fan housing at more than 4 feet to the ceiling roof deck...

Page 11: ...ere are 4 eyelets installed on the fan These metric eyelets are M10 x 75 shanks with a 30 mm loops Standard Cable or chain shall be installed vertically to the ceiling at a 45 degrees angle away from...

Page 12: ...columns or walls see figure 7 Canarm can provide the steel arm kit for existing 6 x8 or an 8 x8 post fixation part FGCY MNTKIT Hardware description is provided with the kit A tilted union for one way...

Page 13: ...0 383 4000 FAX 450 383 4004 www ventecventilation com e 8 Heavy gauge steel base with concrete Figure 8 Cyclo one Plus install on post horizonta ally and at 30 degree angle Contact your Canarm rep for...

Page 14: ...and 24 6mm x 18mm flat washers to mount the deflector brackets Install the turning vanes in between the brackets with the 24 M8 x 25mm bolts and 24 8mm x 25mm flat way rflow See Figures 9 and 10 Fing...

Page 15: ...r Use power wire copper type 600V 105C USA or Canada REW XLPVC or TEW Size all conductors for 3 voltage drop Run a circuit exclusively for the drive Physically split input and output wiring of the dri...

Page 16: ...opper f and 6 3 AUTOMATIC CONTROL SYSTEM Specific directions will be provided for the Automatic Control System Options 7 WARRANTY CANARM Ltd warrants every new fan to be free of defects in material an...

Page 17: ...e fan Note If the fan blade turns counter clockwise you will need to de energize the fan and wait for the VFD to discharge Then reverse two of the motor wiring phase terminals leads Jog the fan again...

Page 18: ...procedure must be done each year Requiered material Grease gun Lithium grease Figure 1 Grease gun STEP 1 Locate the grease fitting on the end of the propeller shaft in front of you STEP 2 Insert grea...

Page 19: ..._______________________________________ __________________________________________________________________ __________________________________________________________________ __________________________...

Reviews: