16
CAUTION
Before adding POT PERM, please check safety
instructions included with the POT-PERM jug and label.
Pour the entire 5 lb jug of POT PERM into the chemical
tank (included with model CGFE948). The powder
stays above the felt pad while the water/Pot Perm
solution stays below it. Typically, five pounds of POT
PERM should last three to four months or more before
refilling with POT PERM powder is required.
Dry Potassium
Permanganate
Storage
Felt Pad
Potassium Permanganate Feeder
Potassium
Permanganate
Water Solution
GREENSAND STARTUP
1.
Remove the locking clip on the brine fitting & insert one end of the 3/8” tubing (included) into this fitting all the way until the tube can go
in no further. Replace the locking clip.
2.
Remove the top lid of the chemical tank. The other end of the tubing goes through the small hole near the top of the chemical tank.
Bring the end of the 3/8” tubing into the brine well and make the connection with the compression fitting on the safety float.
3.
The barbed elbow near the middle of the chemical tank is for a “gravity” overflow line in case of a malfunction resulting in a tank
overflow. This must be run to drain. It uses the same size tubing as the drain line.
WARNING : DO NOT TEE THESE TWO TOGETHER
.
Remove the elastic band from the float assembly inside the chemical tank. DO NOT REMOVE WHITE FELT PAD FROM INSIDE THE
CHEMICAL TANK.
4.
Open the bypass inlet very slowly
until there is a steady stream of water at the drain. Opening the bypass inlet too quickly could result in
resin being expelled from the unit and into the plumbing lines. With the valve in the backwash position the unit will purge air from the
system, sending it to the drain. This may take longer than the programmed backwash cycle time, so unplug the power so that the valve will
remain in the backwash position.
5.
With the bypass inlet now fully open, let the system run until all the air is purged and there is a steady stream of water at the drain.
6.
Reconnect the power, press button two (2) to advance to the refill position and allow the unit to refill to 1” [25.4 mm] above the grid
board – this may require manually advancing the unit through its cycles more than once. Alternatively, you can press and hold button 2 (two)
to advance to the service position and manually add the required amount of water as described in the next step.
ADD THE CHEMICAL (POT-PERM):
The bottom of the chemical tank has a felt pad.
DO NOT REMOVE THIS FELT PAD
. With a bucket or
hose, pour approximately 1 gallon of water into the chemical tank. The exact level is not critical, but be careful not to overflow the tank.
7.
With the bypass inlet now fully open, let the system run until all the air is purged and there is a steady stream of water at the drain.
8.
Slowly open the bypass OUTLET knob until fully open.
NOTE
Your unit is not yet ready for service until you complete
manual regeneration
Potassium permanganate is a
Class C - Oxidizing Material, Class
E - Corrosive Material
Summary of Contents for 85DF