ASSEMBLY INSTRUCTIONS FOR RDC STANDARD AND EP RACKS
9.
Front Restraint Rail (EP only):
With the batteries in place,
slide the front side support rail and cover up from its resting
location to its mounting location, aligning with rear side
restraint rail. Install hardware and torque to 15-20 ft.-lbs.
[20-27 N-m] See Figure 9.
10.
Final Assembly:
Install corner brackets, end restraint rails,
and covers. Position end restraint rail against the end battery
unit. See Detail G. Note that the corner bracket may be
reversed by 180° if required. When the corner bracket
Corner Bracket
Location
Corner Bracket placement when
end restraint rails are within the frame
End Restraint
Rail and Cover
3/8-16 Hex Bolt
and Lock Washer
Side Restraint
Rail and Cover
Serrated Nut
Corner Bracket
Assembled
Side Restraint
Rail and Cover
Support Rail
and Cover
End Restraint
Rail and Cover
End Rail Restraint Rail(s)
and Corner Brackets
assembly is reversed, the end restraint rail is attached to the
opposite side of the corner bracket. When reversed the
corner bracket is able to slide inside the frame uprights
(See Detail H).
Install all front cross braces if indicated by rack assembly
drawing. Torque to 55-65 ft.-lbs. [75-80 N-m] See Figure 11
for final rack assembly.
FIGURE 9
DETAIL G
FIGURE 10
DETAIL H
Front Restraint
Rails & Cover
Installed
End Rail Restraint and
Corner Bracket Reversed
End Restraint
Rail and Cover
3/8-16 Hex Bolt
and Lock Washer
Side Restraint
Rail and Cover
Serrated Nut
Corner Bracket
Assembled
Side Restraint
Rail and Cover
Support Rail
and Cover
End Restraint
Rail and Cover
End Rail Restraint Rail(s)
and Corner Bracket Reversed
RS02098/0114/CD
5
www.cdtechno.com