10
| CAV 4.1 Operation Manual
Tools/Materials Required (Bath Fill & Bath Drain)
Table 7 – Tools/Materials for Bath Fill and Bath Drain
¼
"
Open End Wrench
Yellow Tubing
Silicone Bath Fluid
Bath Drainage Receptacle
Procedure
1.
Turn off power to the CAV 4.1 instrument and let the bath cool to room temperature.
2.
Lift the hood to access the top of the bath.
3.
Remove the float from the top of the bath and set aside. This provides the opening to fill the bath.
Refer to Figure 5.
Figure 5 — Remove Float from Top of Bath to Reveal Opening
4.
Insert funnel into the hole now available by the removed Float. Refer to Figure 6.
Figure 6 — Funnel Inserted into Bath Opening
Bath Opening Fill Hole