15
134911 Rev 1.
ENGLISH
SYNAPSE - OWNERS MANUAL SUPPLEMENT
DT Guide Configurations
Shimano Di2
•
Insert Shimano junction box, RS910 (1) , into DT
guide base (2) before final assembly into the
frame making sure the charging port is towards
the rear of the bike.
•
Rotate the junction box 15 degrees in the base to
secure its position.
•
Attach E-Tube wires.
•
Hook the rear of the guide (a) into the DT port (b)
and then continue to push the guide in the DT.
Make sure the forward tab (c) is hooked under the
front of the DT port.
•
Install the DT Guide – Di2 Cap (3) starting from the
back and working forward.
SRAM eTap
•
Hook the rear of the guide into the DT port and
then continue to push the guide base (2) in the
DT port (a).
•
Make sure the forward tab is hooked under the
front of the DT port wall.
•
Install the DT Guide – eTap Cap (4) starting from
the back and working to front.
Mechanical
•
Loosen the bolt (5) enough so the head is above
the top of the mechnical DT guide (6).
•
Hook the rear of the guide into the DT port and
then continue to push the guide in the DT.
•
Make sure the forward tab is hooked under the
front of the DT port.
•
Tighten the bolt until the head is lightly seated.
DO NOT OVER-TIGHTEN.
1
(c)
3
(a)
2
4
5
6
(b)
2
1
(c)
3
(a)
2
4
5
6
(b)
2
1
(c)
3
(a)
2
4
5
6
(b)
2
FRONT