4
4
4-16
4-16
Parts Replacing and Cleaning > Disassembly/Assembly > Removing the Cassette 2 Pickup Unit > Procedure
Parts Replacing and Cleaning > Disassembly/Assembly > Removing the Cassette 2 Pickup Unit > Procedure
NOTE: How to install the Cassette 2 Separation Roller
• Be sure to align the groove [A] of the coupling with the spring pin [3] of the shaft to install
the roller.
[3]
[A]
• Be sure to align the grove [B] of the Cassette 2 Separation Roller [1] with the protrusion [C]
of the coupling to install the roller.
• Be sure to hook the claw [2].
[B]
[2]
1x
[1]
[C]
F-4-41
F-4-42
Removing the Cassette 2 Pickup Unit
■
Preparation
1) Remove the Rear Cover(Refer to page 4-9).
■
Procedure
1) Disconnect the connector [1] and remove the Wire Saddle [2].
[2]
1x
1x
[1]
F-4-43
F-4-44
Summary of Contents for AG1
Page 5: ... Notes Before it Works Serving Safety Precautions ...
Page 7: ...1 1 Product Outline Product Outline Outline Names of Parts ...
Page 10: ...2 2 Technology Technology Basic configuration Controls ...
Page 22: ...3 3 Periodic Servicing Periodic Servicing Periodic Servicing List ...
Page 45: ...5 5 Adjustment Adjustment Pickup Feed System ...
Page 52: ...6 6 Installation Installation Installation Installing this Equipment ...
Page 54: ... Service Tools General Circuit Diagram Appendix ...