Part 2: Maintenance
BJC-3000
2-12
2.5 Adjustments and Settings after Disassembly/Reassembly
2.5.1 List of adjustment items
(Where adjustments are required/points/tools)
(1) User-level
Required
Adjustment Points
Time
Tools
BJ cartridge
BJ cartridge print position
2 minutes
One sheet of A4/LTR-sized
adjustment
paper
(2) Service Personnel-level
Required when
Reinstalling
the ASF
Reinstalling
the idler pulley
Replacing the
logic board
and the waste
ink absorber
Removing and
replacing
parts related
to the
carriage
Loosening the
screws fixing
the head-to-
paper
distance
Adjustment Points
Initial positions of the ASF
gear and the purge unit
Belt tension
EEPROM setting
BJ cartridge print position
adjustment
Head gap
Time
1 minute
1 minute
1 minute
2 minutes
5 minutes
Tools
Tension spring
None
One sheet of A4/LTR-sized
paper
Gap gauge
Summary of Contents for BJC-3000 Series
Page 2: ...0899 SC 0 30 0 ...
Page 3: ......
Page 12: ...VIII This page intentionally left blank ...
Page 14: ......
Page 28: ......
Page 48: ...Part 2 Maintenance BJC 3000 2 20 This page intentionally left blank ...
Page 50: ......
Page 62: ...Part 3 Operation BJC 3000 3 12 This page intentionally left blank ...
Page 64: ......
Page 88: ......
Page 95: ......
Page 112: ...Part 5 Appendix BJC 3000 5 24 This page intentionally left blank ...
Page 118: ......
Page 119: ...PRINTED IN JAPAN IMPRIME AU JAPON CANON INC The printing paper contains 70 waste paper ...