COPYRIGHT © 1999 CANON INC. CANON CLC1120/1130/1150 REV.0 MAR. 1999 PRINTED IN JAPAN (IMPRIME AU JAPON)
xv
CHAPTER 11 INSTARATION
I.
SELECTING THE SITE ............ 11-1
II.
INSTALLATION ........................ 11-4
A. Unpacking ........................... 11-4
B. Removing the Fixing Materials
and Mounting the Waste Toner
Collection Case ................... 11-7
C. Supplying Fixing Oil ............ 11-9
D. Mounting the Drum Cleaner
and Setting the Environment
Switch ................................ 11-11
E. Supplying Toner ................ 11-15
F. Supplying the Starter
Developer .......................... 11-19
G. Checking the Images and
Operations......................... 11-23
H. Changing the Cassette
Paper Size ......................... 11-25
III.
RELOCATING THE COPIER . 11-28
IV.
MOUNTING THE DOCUMENT
HOLDER ................................ 11-30
V.
INSTALLING THE CONTROL
CARD UNIT-V......................... 11-31
1. Mounting the Control
Card Unit ........................... 11-31
VI. INSTALLING THE COPY DATA
CONTROLLER-A1 ................. 11-33
1. Setting the Board ........ 11-33
2. Installing to the
Copier.......................... 11-35
3. Checking Operations .. 11-37
4. Removing from the
Copier.......................... 11-46
VII. INSTALLING THE REMOTE
DIAGNOSTIC DEVICE II ....... 11-47
1. Installing to the
Copier.......................... 11-47
VIII. INSTALLING THE CASSETTE
HEATER ................................. 11-56
CHAPTER 12 MAINTENANCE AND SERVICING
I.
PERIODICALLY REPLACED PARTS
12-1
II.
CONSUMABLES AND
DURABLES .............................. 12-2
A. Copier .................................. 12-2
B. Side Paper Deck ................. 12-3
III.
SCHEDULED SERVICING
CHART ..................................... 12-4
IV.
SCHEDULED SERVICING
LIST .......................................... 12-6
A. Copier .................................. 12-6
B. Side Paper Deck ................. 12-7
CHAPTER 13 TROUBLESHOOTING
I.
MAINTENANCE AND
INSPECTION ........................... 13-3
A. Image Adjustment Basic
Procedure ........................... 13-3
B. Points to Note for Scheduled
Servicing ............................. 13-6
II.
STANDARDS AND
ADJUSTMENTS ....................... 13-7
A. Image Adjustment System .. 13-7
B. Exposure System .............. 13-14
C. Image Formation System .. 13-15
D. Pickup/Feeding System .... 13-20
E. Fixing System ................... 13-28
F. Externals/Controls ............ 13-31
G. Paper Deck........................ 13-32
H. Electrical System .............. 13-36
III.
TROUBLESHOOTING
FAULTY IMAGES ................... 13-51
A. Making Initial Checks ........ 13-51
Summary of Contents for CLC 1120
Page 6: ......
Page 20: ......
Page 22: ......
Page 48: ......
Page 94: ......
Page 96: ......
Page 114: ......
Page 134: ......
Page 136: ......
Page 152: ......
Page 242: ......
Page 346: ......
Page 374: ......
Page 376: ......
Page 412: ......
Page 452: ......
Page 454: ......
Page 517: ......
Page 881: ......
Page 893: ......
Page 895: ......
Page 899: ......