9
9
9-29
9-29
Installation > Installation > Installing the developing assembly
Installation > Installation > Installing the developing assembly
16) Push in the process unit to the host machine.
CAUTION :
If the process unit fails to be fitted into the rear, turn the groove
of the drum home position detection flag by 45 degree to find
the appropriate position to push in to the rear.
F-9-63
17) Secure the process unit.
• 4 screws (use the screws removed in step 5) at “Removing the transportation packing
member of the process unit”.)
x4
F-9-64
Summary of Contents for imagePRESS 1110
Page 242: ...3 3 Periodical Service Periodical Service Periodical service item ...
Page 655: ...5 5 Adjustment Adjustment Overview When replacing parts Major adjustment ...
Page 944: ...8 8 Service Mode Service Mode Overview COPIER FEEDER SORTER BOARD Situation Mode ...
Page 1555: ... Service Tools General Circuit Diagram General Timing Chart Operator Maintenance Appendix ...