9
9
9-120
9-120
Installation > System Upgrade RAM-B1 > Installation Procedure
Installation > System Upgrade RAM-B1 > Installation Procedure
Installation Procedure
MEMO :
This is required when the color image reader is installed and if color scan is performed in 600dpi resolutions.
1) Remove the 3 screws from the controller cover.
x3
F-9-250
2) Remove the controller cover in the direction of the arrow.
• 12 screws (loosen)
F-9-251
3) Release the claw of the DIMM stopper of the main controller PCB 2 in the direction on the arrow, and install the memory.
F-9-252
4) Install the controller cover.
5) Insert the power plug to the power outlet.
6) Turn the main power switch ON.
Summary of Contents for imagePRESS 1110
Page 242: ...3 3 Periodical Service Periodical Service Periodical service item ...
Page 655: ...5 5 Adjustment Adjustment Overview When replacing parts Major adjustment ...
Page 944: ...8 8 Service Mode Service Mode Overview COPIER FEEDER SORTER BOARD Situation Mode ...
Page 1555: ... Service Tools General Circuit Diagram General Timing Chart Operator Maintenance Appendix ...