4
4
4-219
4-219
Parts Replacement and Cleaning > Periodic Replacing Parts, Durable Parts, Cleaning Parts > Removing ITB
Parts Replacement and Cleaning > Periodic Replacing Parts, Durable Parts, Cleaning Parts > Removing ITB
Removing ITB
<Preparation>
1) Open the Front Left Cover and the Front Right
Cover.
2) Remove Process Unit Cover.
3) Pull Out ITB Unit.
4) Remove ITB Cleaning Unit.
5) Remove Patch Sensor Unit.
Caution :
After removing this part, be sure to
perform the “operation after replacing
the ITB”.
Caution :
Be careful not to scratch the ITB.
1) Loosen the screw, and remove the ITB secondary transfer inlet upper guide.
ITB secondary
transfer inlet
upper guide
F-4-457
Caution : Caution during installation
Insert the Positioning Bosses of the Secondary Transfer Inlet Guide into the hole of the ITB Unit, match the bearing of the ITB Unit to the hole and tighten and secure the
Secondary Transfer Inlet Guide with a screw.
Pre-secondary
transfer guide
Positioning boss
Holes on the ITB unit
Hole
Bearing
Screw
F-4-458
Summary of Contents for imagePRESS 1110
Page 242: ...3 3 Periodical Service Periodical Service Periodical service item ...
Page 655: ...5 5 Adjustment Adjustment Overview When replacing parts Major adjustment ...
Page 944: ...8 8 Service Mode Service Mode Overview COPIER FEEDER SORTER BOARD Situation Mode ...
Page 1555: ... Service Tools General Circuit Diagram General Timing Chart Operator Maintenance Appendix ...