Chapter 16
16-133
RGW-PORT
Specify a port number for a sales company's server used for E-RDS.
1
Setting range
1 to 65535
[Factory setting value / Value after RAM clear: 443]
COM-TEST
Check the connection to a sales company's server used for E-RDS.
Try to connect to the sales company's server. A judgment is made whether the connection has
succeeded or not, and the result is displayed as OK or NG.
1
Result
OK: Connection is possible.
NG: Connection is not possible.
COM-LOG
Display the details of the communication test result with a sales company's server used for E-
RDS.
The screen is switched to the one displaying information of the error that has occurred in
connection to a sales company's server. The error occurrence date, time, error code, and error
information are displayed.
1
The maximum number of logs: 30
Error information: 128 characters max. (NULL is not included.)
RGW-ADR
Specify a URL for a sales company's server used for E-RDS.
[Factory setting value / Value after RAM clear: https://a01.ugwdevice.net/ugw/agentif010]
1
INISET-4
Automatic initial setting mode for installation of the main unit
Simultaneously execute a series of operation required for initial installation of each color
developer.
Since there are many working items required for initial installation of a color developer, this mode
is provided to minimize a mistake by a serviceman or improve his/her work efficiency.
The settings executed by this mode are shown below.
- Electric potential control
- Primary transfer ATVC
- Development idling (adjustment of the charging volume of the developer)
- Correction of the optical volume of the patch detection sensor (adjustment of the optical volume
of the patch detection sensor)
- Transfer cleaning ACVC (determination of high pressure of the transfer cleaning upstream/
downstream brush)
- Optical ATR initial setting (initial setting of noncontact optical ATR)
- Initial setting of patch electric potential control (initial setting of patch electric potential)
- Initial setting of patch detection (initial setting of patch detection ATR)
1
Operation method
1) Select an item to highlight it and press the OK key.
- Start the operation.
- Execute countdown.
2) After the operation completes, OK is displayed.
Remark
Use at initial installation of the machine unit.
Set '0' at AINR-OFF: Turn ON the initial multiple rotation execute SW
INISET-K
Initial installation of the k-color developer
Simultaneously execute a series of operation required for initial installation of the k-color
developer.
Operation method
1) Select an item to highlight it and press the OK key.
- Start the operation.
- Execute countdown.
2) After the operation completes, OK is displayed.
1
INIT-Y/M/C
Read the initial value of the toner density signal (SGNL, REF) for Y/M/C color.
Select an item to highlight it and press the OK key. The operation starts.
2
COPIER>FUNCTION>INSTALL
Subheading Contents
Level
Summary of Contents for imagePRESS C1
Page 1: ...Oct 22 2008 Service Manual imagePRESS C1 Series ...
Page 2: ......
Page 6: ......
Page 38: ...Contents ...
Page 39: ...Chapter 1 Introduction ...
Page 40: ......
Page 42: ......
Page 72: ...Chapter 1 1 30 F 1 18 ...
Page 85: ...Chapter 1 1 43 T 1 26 ...
Page 88: ......
Page 89: ...Chapter 2 Installation ...
Page 90: ......
Page 94: ......
Page 234: ......
Page 235: ...Chapter 3 Basic Operation ...
Page 236: ......
Page 238: ......
Page 244: ......
Page 245: ...Chapter 4 Main Controller ...
Page 246: ......
Page 248: ......
Page 276: ...Chapter 5 Original Exposure System ...
Page 277: ......
Page 332: ...Chapter 6 Laser Exposure ...
Page 333: ......
Page 342: ...Chapter 6 6 8 F 6 10 1 Laser Light 2 Laser Shutter 3 Laser Shutter Lever 1 1 2 2 1 2 3 3 3 3 ...
Page 344: ...Chapter 7 Image Formation ...
Page 345: ......
Page 431: ...Chapter 7 7 82 ...
Page 462: ...Chapter 8 Pickup Feeding System ...
Page 463: ......
Page 504: ...Chapter 8 8 39 7 F 8 52 8 F 8 53 9 F 8 54 1 3 2 1 2 4 3 1 2 4 3 ...
Page 505: ...Chapter 8 8 40 10 F 8 55 11 F 8 56 12 F 8 57 1 4 2 3 5 4 1 3 2 1 4 2 5 3 ...
Page 506: ...Chapter 8 8 41 13 F 8 58 14 F 8 59 15 F 8 60 5 1 2 3 4 1 2 3 5 4 1 2 3 4 5 ...
Page 507: ...Chapter 8 8 42 16 F 8 61 1 2 3 4 5 ...
Page 509: ...Chapter 8 8 44 3 F 8 64 A Duplexing reversal position 4 F 8 65 2 1 A 2 1 ...
Page 510: ...Chapter 8 8 45 5 F 8 66 6 F 8 67 2 1 2 1 ...
Page 511: ...Chapter 8 8 46 7 F 8 68 8 F 8 69 3 2 1 3 2 1 ...
Page 512: ...Chapter 8 8 47 9 F 8 70 10 F 8 71 3 2 1 2 3 1 ...
Page 513: ...Chapter 8 8 48 11 F 8 72 B Duplexing re pickup stop position 12 F 8 73 3 2 B 1 3 1 2 ...
Page 514: ...Chapter 8 8 49 13 F 8 74 14 F 8 75 1 2 3 1 2 3 ...
Page 516: ...Chapter 8 8 51 F 8 77 SL3 M10 PS17 ...
Page 533: ...Chapter 8 8 68 F 8 154 1 2 4 3 2 3 4 ...
Page 534: ...Chapter 9 Fixing System ...
Page 599: ...Chapter 10 Externals and Controls ...
Page 642: ...Chapter 11 MEAP ...
Page 643: ......
Page 645: ......
Page 695: ...Chapter 12 Maintenance and Inspection ...
Page 696: ......
Page 698: ......
Page 700: ...Chapter 12 12 2 F 12 1 28 9 10 14 13 29 29 11 12 27 6 3 1 2 5 4 7 8 15 16 ...
Page 701: ...Chapter 12 12 3 F 12 2 17 20 24 23 25 26 19 18 24 21 22 ...
Page 704: ...Chapter 12 12 6 F 12 3 1 2 3 4 9 6 5 7 8 11 12 13 14 15 10 ...
Page 715: ...Chapter 12 12 17 F 12 18 1 1 2 2 ...
Page 716: ...Chapter 13 Standards and Adjustments ...
Page 717: ......
Page 719: ......
Page 732: ...Chapter 14 Correcting Faulty Images ...
Page 862: ...Chapter 15 Self Diagnosis ...
Page 894: ...Chapter 16 Service Mode ...
Page 895: ......
Page 1222: ...Chapter 17 Upgrading ...
Page 1223: ......
Page 1225: ......
Page 1256: ...Chapter 17 17 31 F 17 65 2 Turn off the main power switch and remove the USB device ...
Page 1257: ...Chapter 18 Service Tools ...
Page 1262: ......
Page 1263: ......
Page 1264: ...Oct 22 2008 ...
Page 1265: ......