8.
Installation Review
8.1 Installation
Time
The time required to install the imagePRESS C7000VP depends on the
options and accessories to be installed, and the number of technicians
performing the installation. Customers should discuss the time requirements
with their servicing dealer and schedule the installation accordingly.
IMPORTANT
•
Set up time may vary due to the following conditions:
-
Forklift availability and its operator
-
Narrow hallways, or a need to remove doors to enter rooms
-
Uneven or damaged floors making leveling the equipment difficult and
time consuming
•
With the aforementioned conditions in mind, an installation of only the
main unit can take between 4 to 6 hours. If accessories are included in the
installation, the times in the table below must be added.
The table below indicates the estimated length of time needed to install the
main unit and optional accessories from the time the machine is unpacked to
when it is installed, and calculated from the average amount of manpower
hours. The estimated installation times are based on a minimum of two
experienced technicians.
Description
Estimated Time
imagePRESS C7000VP – Main Unit
120 Minutes
POD Deck-A1
40 Minutes
Secondary POD Deck-A1
50 Minutes
High Capacity Stacker-C1
30 Minutes
Finisher-AB1/Saddle Finisher-AB2
30 Minutes
Booklet Trimmer-C1
45 Minutes
Color Image Reader-H1
30 Minutes
DADF-R1
20 Minutes
Document Insertion Unit-C1
25 Minutes
8.2 Customer
Responsibilities
Item
Comment
Identify location for equipment.
Area meets space and service space requirements.
Verify strength of floor and level.
Certified by structural engineers.
Ensure that the equipment can be
delivered to the site.
Path is clear and unobstructed.
Confirm proper electrical outlets
and power is available.
Dedicated power, and enough outlets for equipment
(including accessories).
Area meets environmental
specifications.
Temperature and humidity are within specifications,
venting provided if necessary.
Network connections available.
If desired.
Version 1 imagePRESS C7000VP Customer Expectations Document Page 32