CHAPTER 2 STANDARDS AND ADJUSTMENTS
2-43
4.
Primary Charging Output Voltage Correction (PRIMARY)
Perform this adjustment whenever you have replaced any of the following:
• DC controller PCB
• Drum unit
Making Adjustments
• If you have replaced the DC controller PCB,
1) Select '32' in service mode.
• The display will indicate '32'.
2) Press the Copy Start key.
• The existing setting will flash.
3) Enter the value of 'PRIMARY' recorded on the service label using the +/- key.
4) Press the AE key to store the new value.
• If you have replaced the drum unit, execute ‘Installation/drum unit replacement mode’ (U7)
in the user mode.
5.
APVC Measurement Current Correction (IP_OFST)
Perform this adjustment whenever you have replaced any of the following:
• DC controller PCB
• Drum unit
Making Adjustments
• If you have replaced the DC controller PCB,
1) Select '33' in service mode.
• The display indicate '33'.
2) Press the Copy Start key.
• The existing setting will flash.
3) Enter the value of 'IP_OFST' recorded on the service label using the +/- key.
4) Press the AE key to store the new value.
• If you have replaced the drum unit, execute ‘Installation/drum unit replacement mode’ (U7)
in the user mode.
Summary of Contents for NP6412
Page 6: ......
Page 12: ......
Page 34: ......
Page 46: ......
Page 48: ......
Page 92: ......
Page 144: ......
Page 176: ......
Page 178: ......
Page 192: ......
Page 194: ......
Page 220: ......
Page 222: ......
Page 256: ......
Page 258: ......
Page 282: ......
Page 284: ......
Page 286: ......
Page 384: ......
Page 388: ......
Page 414: ......
Page 424: ......
Page 430: ......
Page 432: ......
Page 434: ......
Page 484: ......
Page 492: ......
Page 502: ......
Page 506: ......
Page 516: ......
Page 599: ...PRINTED IN JAPAN IMPRIME AU JAPON ...