2. Assembly
a. Front Wire
1) Set the pulley positioning pin on the right side of the shaft as viewed from the front.
2) Wind wire 1 on pulley one and half rounds from the second groove from the rear and install
the pulley on the shaft.
3) Wind wire 2 on pulley one and half rounds from the second groove from the rear and install
the pulley on the shaft.
4) Secure the pulleys and shaft with the E ring.
➀
Shaft
➁
Pulley positioning pin
➂
Wire 1
➃
Wire 2
➄
Pulleys
➅
E ring
Figure 3-4-12
3 - 11
CHAPTER 3
➀
➁
➂
➃
➄
➅
Summary of Contents for PD-82
Page 8: ......
Page 14: ......
Page 16: ......
Page 28: ......
Page 30: ......
Page 37: ...IV MAIN PARTS A Locations Lifter Figure 3 4 1 3 7 CHAPTER 3 ...
Page 50: ...VIII MOTORS A Locations Lifter motor Pick up motor Feed motor Figure 3 8 1 3 20 CHAPTER 3 ...
Page 58: ......
Page 62: ...Figure 4 1 2 1 Pick up roller 2 Feed roller 3 Separation roller 4 4 CHAPTER 4 ...
Page 80: ......
Page 81: ...APPENDIX I GENERAL CIRCUIT DIAGRAM A 1 II LIST OF SIGNALS A 3 ...
Page 82: ......
Page 84: ......