2-46) Assemble the parts in the reverse order from step 2-42).
3) Operation check with operation test mode. (Operation check for the waste paper buffer and dust catch unit)
[Note]Remove the front cover (left/right) and the inner cover (lower) to check the inside of machine visually during the operation
test. The front cover (left/right) and the inner cover (lower) are removed during the checking, so insert door switch tools into right
front cover switch and left front cover switch and turn on the power supply switch, then start the operation test.
[Note] Do not put your hand into the inside of machine during the operation test because the front cover (left/right) and the inner
cover (lower) are removed.
3-1) Move all units to their home positions. (Initial operation)
Turn off the power supply and set SW1-2 [1] and the SW2-8 [2] of the service PCB to ON and then turn on the power supply
switch. When the initial operation is finished, turn off the power supply again.
189