Making Checks After
Completion of Installation
Work
Disposal Parts Check
Following disposal parts are remained after completion of the
installation work.
[1]
Reverse Trailing Edge Guide (In the case
it was installed in the Host Machine.)
1 pc.
[2]
Inner Connector Cover
1 pc.
[3]
Remaining Tray Setting Labels
1 pc.
[4]
Remaining Language Jam label (Booklet
Finisher only.)
1 pc.
[4]
Remaining Caution Language Label
(Booklet Finisher only.)
1 pc.
Operation Check
1.
Turn ON the main power of the Host Machine.
2.
3.
4.
If a message prompting the user to update the
version appears, press [Update] to automatically
update the version of the Finisher.
NOTE:
If [Skip] is selected, a message prompting the user to
update the version will appear every time the Host
Machine is started. In the service mode (Level 2) shown
below, it is possible to set not to display the message.
• (Level2) COPIER > OPTION > FNC-SW > VER-
CHNG
5.
Check the operation such as paper feed and stapling
to make sure that problems such as a jam or
malfunction do not occur.
7. Installation
213
Summary of Contents for Staple Finisher-AA1
Page 1: ...Revision 4 0 Staple Finisher AA1 Booklet Finisher AA1 Service Manual ...
Page 12: ...Product Overview 1 Features 5 Specifications 6 Names of Parts 14 Optional Configuration 20 ...
Page 83: ...Periodical Service 3 Periodic Servicing Tasks 76 ...
Page 87: ...3 Remove the 2 Connectors 1 2x 1 4 Parts Replacement and Cleaning 79 ...
Page 89: ...Main Units Parts 4 5 6 7 8 1 2 3 4 Parts Replacement and Cleaning 81 ...
Page 128: ...4x 1 2 2 3 3 2x 4 Parts Replacement and Cleaning 120 ...
Page 150: ...Adjustment 5 Overview 143 Basic Adjustment 148 Adjustments When Replacing Parts 173 Other 184 ...
Page 193: ...Troubleshooting 6 Making Initial Checks 186 Processing Tray Area 187 Saddle Stitcher Area 188 ...
Page 204: ...4 5 6 7 8 9 7 Installation 196 ...
Page 205: ...10 7 Installation 197 ...
Page 223: ...2 3 2x 7 Installation 215 ...
Page 224: ...APPENDICES Service Tools 217 General Circuit Diagram 218 ...