4
4
4-32
4-32
Parts Replacement and Cleaning Procedure > Major Units > Removing the Sub Paddle > Procedure
Parts Replacement and Cleaning Procedure > Major Units > Removing the Sub Paddle > Procedure
Removing the Sub Paddle
■
Preparation
1) Remove the Finisher Unit from the connected equipment(Refer to page 4-9).
2) Remove the Staple Cartridge(Refer to page 4-22).
3) Remove the Front Cover(Refer to page 4-15).
4) Remove the Rear Cover(Refer to page 4-16).
5) Remove the Upper Cover(Refer to page 4-17).
6) Remove the Paddle Motor (M3) (Refer to page 4-44).
7) Remove the Staple Unit(Refer to page 4-23).
8) Remove the Front Door Switch (S15) (Refer to page 4-53).
9) Remove the Finisher Lower Feed Guide Unit(Refer to page 4-27).
■
Procedure
CAUTION:
Be sure to perform the work while keeping contact with the 4 new Sub Paddles [1] at a
minimum at disassembly/assembly.
[1]
[1]
F-4-80
F-4-79
1) Remove the Finisher Lower Feed Guide [2] from the Finisher Lower Feed Guide Unit [1].
• 3 Screws [3]
[1]
[2]
[3]
[3]
[3]
3x
2) Remove the Shaft Retainer Plate [1].
• 2 Screws [2]
• 2 Bosses [3]
• 2 Belts [4]
2x
[1]
[2]
[2]
[3]
[3]
[4]
[4]
F-4-81
F-4-82
Summary of Contents for Staple Finisher-S1
Page 6: ...Safety Precautions Notes Before Servicing Points to Note at Cleaning ...
Page 8: ...1 1 Product Outline Product Outline Features Specifications Names of Parts ...
Page 36: ...3 3 Periodic Servicing Periodic Servicing List of Work for Scheduled Servicing ...
Page 94: ...5 5 Adjustment Adjustment Adjustment Item Dip Switch Function ...
Page 113: ...Appendix Service Tools General Circuit Diagram ...