G3 Signal Transmission Test (G3 Tx) ------------------------------------------------5-22
DTMF Transmission Test ----------------------------------------------------------------5-23
V.34 G3 Signal Transmission Test (V34G3Tx) -------------------------------------5-23
Function Test -----------------------------------------------------------------------5-24
4800-bps Signal Transmission Test ---------------------------------------------------5-24
Service Report (REPORT) ------------------------------------------------ 5-25
System Data List ------------------------------------------------------------------5-25
System Dump List ----------------------------------------------------------------5-25
Error Transmission Report ------------------------------------------------------5-27
How to Check this Installation Procedure -------------------------------6-2
Check Items when Turning OFF the Main Power ---------------------6-2
Installation Outline Drawing ------------------------------------------------6-2
Checking the Contents ------------------------------------------------------6-3
Installation Procedure --------------------------------------------------------6-4
Installing the Fax Unit---------------------------------------------------------------------- 6-4
Installing the Speaker---------------------------------------------------------------------- 6-7
Procedure after Work ---------------------------------------------------------------------- 6-9
Operation Setting ----------------------------------------------------------- 6-10
Operation Setting -----------------------------------------------------------------6-10