6
6
Installation
Installation
6-9
6-9
Installation > Installation Procedure
Installation > Installation Procedure
■
Procedure after Work
1) Affix the Modular Label.
2) Connect the PTT Plug matched the field or area to the Telephone Cord (6 Contact type).
NOTE:
• This step is only for Europe.
• Do not connect the Telephone Cord (2 contact type) with the PTT Plug.
F-6-21
F-6-22
3) Connect the PTT Plug or the Telephone Cord to the Modular Jack on the wall side, and
connect the other side to the Modular Jack for host machine line.
4) Affix the Label.
• FCC/IC Label (Only for USA)
• FAX Approval Label (Only for other destination)
5) Connect the power plug to the outlet.
6) Turn ON the main power switch.
F-6-23
F-6-24