9.1 Installation Time
The time required to install the Canon varioPRINT 135
depends on the options and
accessories to be installed, and the number of technicians performing the
installation. Customers should discuss the time requirements with their servicing
dealer and schedule the installation accordingly.
The table below indicates the estimated length of time needed to unpack and
install the machine and optional accessories, and calculated from the average
amount of manpower hours. The estimated installation times are based on a
minimum of two (2) experienced technicians.
Description
Estimated Time
Main Unit
3 hours
Operator Panel
15 minutes
Operator Attention Light-C1
5 minutes
Duplex Color Image Reader-D1
13 minutes
Color Image Reader-J1 (Printer Only Model)
15 minutes
ePIM-C1
45 minutes
Bulk Tray Small Format
45 minutes
Document Insertion Unit-F1
10 minutes
Duo Paper Tray-C1
90 minutes
High Capacity Stacker-E1
12 minutes
Second High Capacity Stacker-E1
15 minutes
High Capacity Stacker-G1
1 hour
Second High Capacity Stacker-G1
1 hour
Paper Folding Unit-F1
11 minutes
Finisher-AK1/Saddle Finisher-AK2
12 minutes
Professional Puncher-B1 with Professional Puncher Integration Unit-A1
18 minutes
Booklet Trimmer-D1
28 minutes
Two-Knife Booklet Trimmer-A1
11 minutes
SDD Square Fold Booklet-Maker & Two-Knife Trimmer
2 hours
SDD Square Fold Booklet-Maker
2 hours