E13
3 OPERATION
3-1 Zoom and Focus
Operation
Full-servo System Operation
Zoom and Focus operations are performed based on a
configuration as shown in the figure below.
For the operating procedure, refer to the operation manual
for the respective unit.
①
Servo module
②
Zoom servo demand
③
Focus servo demand
④
Demand cable
Manual System Operation
Zoom and Focus operations are performed based on a
configuration like that shown in the figure below. For the
operating procedures, refer to the operation manual for the
respective unit.
①
Flexible module
②
Flexible zoom control unit
③
Flexible focus control unit
④
Flexible cable
⑤
Switch box unit
Semi-servo System Operation
Zoom and Focus operations are performed based on a
configuration like that shown in the figure below.
For the operating procedures, refer to the operation manual
for the respective unit.
①
Flexible module
②
Flexible focus control unit
③
Servo module
④
Zoom servo demand
⑤
Flexible cable
⑥
Demand cable
Summary of Contents for XJ100x9.3B
Page 2: ......
Page 3: ...ENGLISH VERSION The English version is the operation manual for counties other than Japan ...
Page 36: ......
Page 38: ......
Page 65: ...memo ...
Page 66: ...memo ...
Page 67: ...memo ...