6-10KVA Rack-mount UPS User Manual Installation
12
0.5m of space on each side.
3) Condensation to water drops may occur if the UPS is unpacked in a very low
temperature environment. In this case it is necessary to wait until the UPS is fully
dried inside out before proceeding installation and use. Otherwise there are hazards
of electric shock.
2. Installation
Installation and wiring must be performed in accordance with the local electric code and the
following instructions by professional personnel.
For safety, please cut off the mains power switch before installation. Open the battery breaker
for long backup time model (“L” model).
1) Pull out the Distribution Box .then open the terminal block cover located on the left side
of the Removable Power Distribution Box factory-attached; please refer to the
appearance diagram.
2) For 6KVA UPS, it is recommended to select the UL1015 10AWG(6mm
2
) wire or other
insulated wire which complies with AWG Standard for the UPS input and output
wirings.
3) For 10KVA UPS, it is recommended to select the UL1015 8AWG(10mm
2
) wire or other
insulated wire which complies with AWG Standard for the UPS input and output
wirings.
NOTE
:
Do not use the wall receptacle as the input power source for the UPS, as its rated
current is less than the UPS’s maximum input current. Otherwise the receptacle may be burned
and destroyed. For the long backup time modes, make sure that the capacity of batteries is
larger than 24AH to avoid over charging.
4
)
Loosen the nuts from the thread plastic cable gland . Connect the input and output wires
to the corresponding input and output terminals through the nut and the thread plastic cable
gland according to the following diagram.
Tighten the nuts onto the
thread plastic cable gland
by hand.