5
Technical data
230 V AC - 50 Hz
Top conventional oven
– Top element
0.700 kW
– Bottom element
1.000 kW
– Grill element
2.000 kW
Bottom fan oven
– Fan element
2.200 kW
Maximum power rating
– Top oven
2.000 kW
– Bottom oven
2.200 kW
Oven lamp
0.015 kW
300 °C, miniature edison screw
Fan motor
0.025 kW
Maximum power
usable simultaneusly
4,275 kW
Electrical feeder cable
connection
To connect the feeder cable to the cook-
er it is necessary to:
– Remove the 2 screws that hold shield
A behind the cooker.
– Open completely the cable clamp D.
– Insert the feeder cable into the cable
save P. The supply cable must be of a
suitable size for the current require-
ments of the appliance; see the
section “Feeder cable section”.
– Connect the phase and earth cables to
terminal B according to figures 1.2 and
1.1.
– Pull the feeder cable and block it with
the cable clamp D.
– Re-mount shield A.
N.B. The earth conductor must be left
about 3 cm longer than the others.
P
D
B
A