69
Removing a Cylinder
Follow these steps when removing a cylinder:
1. On the primary cylinder, disconnect the hose that connects the PAK with the cylinder.
2. Remove the mounting bolts connecting the PAK to the primary cylinder. Lift the PAK up and place the
PAK into the bracket in the ship/test position. Ensure it is supported by the shipping bolts.
3. Install the Valve Protection Plate on top of the valve using the mounting bolts and 2 nuts. Refer to
4. Loosen the bolts holding the valve to the discharge adapter and cylinder bracket.
5. Loosen the bolts and remove the straps holding the cylinder in place.
6. Pull the cylinder out from the bracket. Immediately install the Anti-recoil cap onto the valve discharge
outlet.
7. If secondary cylinders are present, remove the mounting bolts connecting the Secondary Actuators to
the secondary cylinders. Lift the actuators up and place the actuators into the bracket. Ensure they are
supported by the shipping bolts. Install the Valve Protection Plates on top of each secondary cylinder’s
valve using the mounting bolts and 2 nuts. Refer to
.
8. For each secondary cylinder, perform the following before moving to the next secondary cylinder:
• Remove the Supervisory Pressure Switch from the cylinder valve if applicable.
• Loosen the bolts holding the valve to the discharge adapter and cylinder bracket.
• Loosen the bolts and remove the straps holding the cylinder in place.
• Pull the cylinder out from the bracket. Immediately install the Anti-recoil cap onto the valve
discharge outlet. Refer to
Figure 50 - Installing Valve Protection and Anti-Recoil Plate
Cylinder
Assembly
Valve
Protection
Plate
Anti-Recoil
Plate
Summary of Contents for EWC
Page 2: ...2 ...