17
Step 5:
Assembly of the Handle Bars and Bottle Holder
1. First slide one waved washer (74) and the left upper foot cap (82L) onto the handlebar post tube
(10) (Fig. 5-1).
2. Fix the left handlebar welding set (30L) onto the handlebar post tube (10) with one screw (9)
and one flat washer (18) (Fig. 5-1).
3. Fix the right upper foot cap (82R) onto the left upper foot cap (82L) with four screws (117) (Fig.
5-1).
4. Repeat the steps 1-3 on the right side (Fig. 5-2).
5. Fix the bottle holder (147) onto the handlebar post tube (10) with two screws (116).
Summary of Contents for CST-FX70
Page 2: ...2 FX70...
Page 44: ...44 FX70 8 3 Exploded Drawing...
Page 49: ...49 Notes...
Page 50: ...50 FX70 Notes...
Page 51: ...51...
Page 52: ...Crosstrainer FX70...